American Electric Power, a 100-year-old electric transmission system, maintains one of the strongest electric grids in the United States.
Aristeo managed this project, which included site work for two 138 kV substations and associated access roads. The scope of work included all cut and fill, grading, stone placement and 2,050 linear feet of access roads. This project was completed during the spring, which required the team to work around wet conditions like rain and snow.