Reborn Paint Package
- 475,000 square foot new paint shop at TMMK facility
- 2,000 cubic yards of concrete for site work and foundations
- 125 tons of resteel for footings, grade beams, walls, piers, and flatwork
- Extensive demolition of concrete and asphalt pavement, and earthwork
- Drilled piers, spread footings, formed piers, foundation and retaining walls
- Underground fire protection included new fire mains, hydrants, and lead-ins
- Firewater storage tank and associated storm structures, RCP piping, and steel
- Demolition of existing site lighting, relocation of light poles and fixtures, associated rework of terminations of underground feeders, and building grounding system
- Rerouting of existing underground water and natural gas
- New asphalt and concrete pavements, sidewalks, and stoops around perimeter of new building
- New siding, roofing, and overhead doors
- New restroom and locker room installation
- Office area complete with architectural finishes
- New power distribution, including nine new unit substations
- All required building mechanical systems including installation of 34 new HVAC units and 20 associated condensing units and 20 associated condensing units set via helicopter
- All required building electrical systems, including approximately 6,000 linear feet of new 15 kV cable for tie-in to existing utility building and 42,000 linear feet of new 480V cable
- All required building fire suppression and life safety systems
- Building management systems