As part of Aristeo's design build construction, Aristeo's steel division was asked to provide the fabrication and installation of 168 tons of die cast support steel, 322 tons of pit cover steel, 85 tons of truck dock and substation building steel and 50 tons of miscellaneous iron. The die cast steel was fabricated into (8) 6 FT by 65 FT frames in the shop. Each framed, weighing about 42,000 tons, was then shipped to the site and installed.

The die cast steel had to be set to very tight tolerances (within 1/8") over 65 FT. our work area was in an existing narrow pit that was 13FT deep. The existing facility structural steel was abated for lead point prior to connections of the steel members. The work was completed safely on schedule.

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Detroit, Michigan
Owner: EWI Worldwide
Project Value: $1,000,000

NAIAS Exhibit, Steel Framing

Location: Detroit, Michigan
Owner: Detroit Entertainment LLC
Project Value: $11,000,000
 

Facade Replacement

Location: Detroit, Michigan
Owner: Detroit Building Authority
Project Value: $3,500,000
 

Headquarters Building Restoration
A projects’ success is directly proportional to the quality of the people on its team. I was lucky enough to be working with some of the absolute best. Every employee from the top on down was proactive, demonstrated safety awareness, exceptional job skills, and was willing to do what it takes to get the job done. General Motors Corporation