Installation

General Motors Warren Transmission

GFE Equipment Installation

General Motors Warren Transmission - Equipment Installation - Aristeo Construction  - GM_Warren_Transmission_GFE

Aristeo self performed millwright and all rigging associated with automatic transmission assembly and testing equipment at the General Motors Warren Transmission Plant for the Global FWD Electric transmission. In addition, to self perform installation activities, Aristeo was the prime contractor managing all electrical, piping, painting, steel fabrication and sheet metal work performed on this project. The project duration was approximately five months.

The transmission assembly line, which covered over 60,000 SF included the main line, carrier sub assembly, housing assembly, case sub assembly, valve body sub assembly, and miscellaneous offline stations, robots, and crane systems.

The transmission test and Button Up process encompassed 30,000 SF and Includes manual and automatic stations, test stands, washers, gantries, and crane systems.

Location: Allen Park, Michigan
Owner: Ford Motor Company
Project Value: $200,000,000

Vehicle Performance & Electrification Center

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Lincoln, Alabama 
Owner: Honda Motor Company  
Project Value: $2,100,000

Line 2 Modifications

Location: Marysville, Ohio
Owner: Honda Motor Company
Project Value: $11,000,000

Line One Innovation

Location: Kokomo, Indiana
Owner: FCA US LLC.
Project Value: $8,500,000
 

Eight Speed Rotating Equipment Installation

Location: Trenton, MI
Owner: FCA US LLC
Project Value: $5,500,000
 

GMET 4 Engine Equipment Installation

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation