GFE Equipment Installation
Aristeo self performed millwright and all rigging associated with automatic transmission assembly and testing equipment at the General Motors Warren Transmission Plant for the Global FWD Electric transmission. In addition, to self perform installation activities, Aristeo was the prime contractor managing all electrical, piping, painting, steel fabrication and sheet metal work performed on this project. The project duration was approximately five months.
The transmission assembly line, which covered over 60,000 SF included the main line, carrier sub assembly, housing assembly, case sub assembly, valve body sub assembly, and miscellaneous offline stations, robots, and crane systems.
The transmission test and Button Up process encompassed 30,000 SF and Includes manual and automatic stations, test stands, washers, gantries, and crane systems.