Aristeo Installation was selected to install axle assembly lines at American Axle & Manufacturing’s new facility in Three Rivers, MI. The recently installed lines are used to manufacture new Rear Drive Assembly (RDU) and Front Drive Assembly (FTR) products for FCA US.

The new assembly equipment, supplied by ABB, covers 40,000 SF of manufactured space. Installation was completed over a 10 day compressed schedule to eliminate potential delays with the launch of the new product.

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Kokomo, Indiana
Owner: FCA US LLC.
Project Value: $8,500,000
 

Eight Speed Rotating Equipment Installation

Location: Trenton, MI
Owner: FCA US LLC
Project Value: $5,500,000
 

GMET 4 Engine Equipment Installation

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation
A projects’ success is directly proportional to the quality of the people on its team. I was lucky enough to be working with some of the absolute best. Every employee from the top on down was proactive, demonstrated safety awareness, exceptional job skills, and was willing to do what it takes to get the job done. General Motors Corporation