Power

DTE Energy

 Pinnebog Wind Park

DTE Energy - Power - Aristeo Construction  - YUN00020_(2)

The Pinnebog Windpark, near Bad Axe, MI, consists of 30 wind turbine generators that stand 96 meters tall at the turbine hub.  

Aristeo’s Balance of Plant (BOP) contract with DTE energy includes the construction of access roads, turbine foundations, turbine erection, installation of the electrical collection system, tower wiring, site restoration, and the expansion of the existing Pinnebog Substation. Each foundation contains over 440 CY of concrete and includes approximately 40 tons of reinforcing steel.

The electrical collection system will transmit the turbine generated power back to the wind park substations at 34.5kV. Voltage will ultimately be stepped up to 345kV for the interconnection with the Michigan Thumb Loop transmission system.

Aristeo has worked with Marathon since 2005 and has never had a recordable safety incident on any of our projects. Their dedication to safety and doing work right has made Aristeo a preferred contractor. We are impressed by the service Aristeo provides and will continue to recommend their team on upcoming projects. Marathon Petroleum Company LLC