Manufacturing

Toyota Motor Manufacturing Kentucky

TMMK Body Weld Additions

Toyota Motor Manufacturing Kentucky - Manufacturing - Aristeo Construction  - IMG_1433

In support of Lexus production at Toyota’s manufacturing facility in Georgetown, Aristeo performed a series of projects beginning with Body Weld Addition Phase 1. This included site work, foundations, concrete slabs and structural steel to support a 23,000 SF expansion of the body weld shop. Challenges included an aggressive delivery schedule, design changes, and unforeseen bedrock conditions.

Following the successful completion of Phase 1, Aristeo secured an additional six building addition and relocation bid packages. In total, Aristeo was responsible for the site work, foundations and slab on grade for approximately 313,000 SF of additional building space. 

Location: Allen Park, Michigan
Owner: Ford Motor Company
Project Value: $200,000,000

Vehicle Performance & Electrification Center

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $180,000,000
 

P558 Super Duty Program

Location: Huntsville, Alabama
Owner: Toyota Motor Manufacturing Alabama
Project Value: $35,000,000

V-6 Engine Building Expansion

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Woodhaven, MI
Owner: Ford Motor Company
Project Value: $50,000,000
 

Woodhaven Stamping Plant

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location:  Lansing, Michigan
Owner: General Motors
Project Value: $30,000,000
 

C1Yx Building Expansions

Location: Warren, Michigan
Owner: General Motors
Project Value: $14,000,000
 

Aerodynamics Lab & Reduced Scale Wind Tunnel

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Plymouth, Michigan
Owner: Hyundai Mobis 
Project Value: $7,000,000
 

Mobis North America Technical Center

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation

Location: Wayne, Michigan; Woodhaven, Michigan; Chicago, Illinois
Owner: Ford Motor Company
Project Value: $25,000,000 Annually
 

Construction Commodity Management
The Aristeo team has done a great job executing the Pinnebog Project.  Project execution and coordination with all parties was performed at the highest level.  Great priority focus on job site safety resulting in zero instances.  Thank you for a job well done! DTE Energy Co.