Stellantis - Manufacturing - Aristeo Construction  - DJI_0302_recent_2_edit

Stellantis awarded the Walbridge-Aristeo Joint Venture (WAJV) the renovation and modernization of two existing engine plants in Detroit to become the city's first new assembly plant in 30 years. After a $1.6 billion investment, the Detroit Assembly Complex-Mack Plant has launched the all-new, three-row Jeep Grand Cherokee L, added 3,850 new jobs, and now has the lowest emissions rate of any auto assembly plant in the United States.

As a brownfield reclamation site with plants originally built for ground-level conveyor engine assembly, there were unique challenges to transitioning this project to a state-of-the-art facility for the Grand Cherokee L, the next generation Jeep Grand Cherokee and electrified models. The work included:

  • Removal of 3.7 miles of flumes and filter galleries using innovative methodologies
  • Adding new pits and foundations for new assembly equipment
  • Modifying 112 trusses and reinforcing 625 trusses to support new equipment
  • Adding new testing, quality, and other infrastructure to plant
  • Updating one million square feet of roofing
  • Replacing the St. Jean roadway with new employee parking areas
  • Expanding the adjacent railway

This extensive project was completed within an aggressive schedule, despite the unexpected closure of the jobsite for four weeks during the COVID-19 pandemic, thanks to the precise planning, state-of-the-art techniques and equipment, and partnership between Stellantis and WAJV. The teams utilized visual planning, BIM Modeling, Last Planner, and interactive technology. With these tools, they created a critical four-week look-ahead schedule for all subcontractors and the project as a whole. In addition, the WAJV exceeded goals set by the City of Detroit-based subcontractor/supplier sourcing and Detroit resident workforce participation. The project also exceeded diverse business sourcing goals. 

Thanks to the combined efforts of WAJV and our subcontractor partners, this 1.3 million work hour project was completed with no lost time injuries and within the accelerated, 19-month timeframe allowing Stellantis to begin equipment and process validation by the end of 2020.

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $180,000,000
 

P558 Super Duty Program

Location: Huntsville, Alabama
Owner: Toyota Motor Manufacturing Alabama
Project Value: $35,000,000

V-6 Engine Building Expansion

Location: Georgetown, Kentucky
Owner: Toyota Motor Manufacturing Kentucky
Project Value: $30,000,000
 

TMMK Body Weld Additions

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Georgetown, Kentucky 
Owner: Toyota Motor 
Project Value: $65,000,000

Reborn Paint Package

Location: Lincoln, Alabama 
Owner: Honda Motor Company  
Project Value: $2,100,000

Line 2 Modifications

Location: Marysville, Ohio
Owner: Honda Motor Company
Project Value: $11,000,000

Line One Innovation

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Woodhaven, MI
Owner: Ford Motor Company
Project Value: $50,000,000
 

Woodhaven Stamping Plant

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location:  Lansing, Michigan
Owner: General Motors
Project Value: $30,000,000
 

C1Yx Building Expansions

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Wayne, Michigan; Woodhaven, Michigan; Chicago, Illinois
Owner: Ford Motor Company
Project Value: $25,000,000 Annually
 

Construction Commodity Management