Manufacturing

Honda Motor Company MFG of Alabama

Line 2 Modifications 

Aristeo's Honda Motor Company Line One Innovation Project

Honda Motor Company awarded Aristeo the $2.1 million Line 2 Modifications project for their Honda Manufacturing of Alabama facility. The project required an extension of the existing conveyor line so the facility could accommodate a new product line. As general contractor on this project, Aristeo managed seven different trades, including our own self perform crews that performed demolition, excavation, steel fabrication and installation, and concrete placement services. 

For this project, Aristeo provided demolition services for 32,000 square feet of concrete floor in the facility, excavating 2,000 cubic yards of material and lowering the floor by three feet across two-thirds of the space. Aristeo also poured 1,100 cubic yards of concrete and placed both resteel and steel embeds to support the weight of facility equipment.

Placing concrete in an active facility presented a unique problem – the space would not fit a traditional concrete pump truck and they could not disturb plant production. Aristeo proactively developed a solution and utilized a spider boom to extend the reach of the pump truck. This allowed concrete to be placed precisely where needed with minimal disruption to plant activities. We also utilized a truss screed to provide a more uniform finish for the concrete surface.

This project also required the existing plant electrical and mechanical utilities to be extended for the new lines. Aristeo oversaw subcontractors as they extended electrical systems by 2,000 linear feet and added 1,800 feet of new piping – both of which needed to be extended through the active plant to the new space. Much of this work, as well as the concrete placement work, was completed during night and weekends to minimize disruption to the plant.

The project near completion and has proceeded on budget and with an excellent safety record of zero incidents.

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $180,000,000
 

P558 Super Duty Program

Location: Huntsville, Alabama
Owner: Toyota Motor Manufacturing Alabama
Project Value: $35,000,000

V-6 Engine Building Expansion

Location: Georgetown, Kentucky
Owner: Toyota Motor Manufacturing Kentucky
Project Value: $30,000,000
 

TMMK Body Weld Additions

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Detroit, Michigan
Owner: Stellantis
Project Value: Confidential

Phase 1 Foundations

Location: Georgetown, Kentucky 
Owner: Toyota Motor 
Project Value: $65,000,000

Reborn Paint Package

Location: Marysville, Ohio
Owner: Honda Motor Company
Project Value: $11,000,000

Line One Innovation

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Woodhaven, MI
Owner: Ford Motor Company
Project Value: $50,000,000
 

Woodhaven Stamping Plant

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location:  Lansing, Michigan
Owner: General Motors
Project Value: $30,000,000
 

C1Yx Building Expansions

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Wayne, Michigan; Woodhaven, Michigan; Chicago, Illinois
Owner: Ford Motor Company
Project Value: $25,000,000 Annually
 

Construction Commodity Management