Manufacturing

Ford Livonia Transmission

Case Machining Line Installation

Ford Livonia Transmission - Manufacturing - Aristeo Construction  - Screen_Shot_2016-05-24_at_11

As follow up to our concrete and structural steel services at Ford’s Livonia Transmission Plant, Aristeo Installation’s scope of work on this bid package included installation of Case and Converter machining lines to support production of new nine and ten speed transmissions. In conjunction with our mechanical, electrical, and controls specialty contractors, Aristeo worked with the architectural engineering firm, automation suppliers, and OEM’s to complete this turn key project from equipment receipt and unload, through commissioning and process sign offs. Installation was based upon 3D/BIM drawings provided by the project engineering team.

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $180,000,000
 

P558 Super Duty Program

Location: Huntsville, Alabama
Owner: Toyota Motor Manufacturing Alabama
Project Value: $35,000,000

V-6 Engine Building Expansion

Location: Georgetown, Kentucky
Owner: Toyota Motor Manufacturing Kentucky
Project Value: $30,000,000
 

TMMK Body Weld Additions

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $4,000,000
 

Paint Booth Steel

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Woodhaven, MI
Owner: Ford Motor Company
Project Value: $50,000,000
 

Woodhaven Stamping Plant

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location:  Lansing, Michigan
Owner: General Motors
Project Value: $30,000,000
 

C1Yx Building Expansions

Location: Warren, Michigan
Owner: General Motors
Project Value: $14,000,000
 

Aerodynamics Lab & Reduced Scale Wind Tunnel

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Plymouth, Michigan
Owner: Hyundai Mobis 
Project Value: $7,000,000
 

Mobis North America Technical Center

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation

Location: Wayne, Michigan; Woodhaven, Michigan; Chicago, Illinois
Owner: Ford Motor Company
Project Value: $25,000,000 Annually
 

Construction Commodity Management
Aristeo worked on site for over a year in good and nasty weather and through it all the company and all employees maintained a positive and professional attitude. Everybody I spoke with stated they would be very happy to see Aristeo return at any time for another project. Greater Gratiot Development, Inc.