Manufacturing

Ford Kentucky Truck Assembly

Paint Booth Steel

Ford Kentucky Truck Assembly - Manufacturing - Aristeo Construction  - IMG_2715(1)

Adding to its impressive list of automotive paint shop structural steel projects, our steel department completed phosphate/e-coat and ITM paint booth support steel projects at Ford’s Kentucky Truck Plant in Louisville, KY. These projects were comprised of structural and miscellaneous steel members including columns, beams, plate modules, robot support steel, grating, stairs and handrail which totaled over 800 tons. Due to project site access constraints, the ITM project team separated steel fabrication and erection into 44 sequences as this challenging project was completed between existing paint systems.

On the phosphate/e-coat project, our client, Durr Systems, sourced the grillage steel to a low cost country supplier and steel erection was completed by Aristeo. Not having the steel fabrication under our control presented the project team with work sequencing issues and a unique set of scope of work challenges. Working collectively with Durr, the team was able to resolve the outstanding issues, and steel erection was completed on time to permit the installation of paint process equipment.

Location: Allen Park, Michigan
Owner: Ford Motor Company
Project Value: $200,000,000

Vehicle Performance & Electrification Center

Location: Louisville, Kentucky
Owner: Ford Motor Company
Project Value: $180,000,000
 

P558 Super Duty Program

Location: Huntsville, Alabama
Owner: Toyota Motor Manufacturing Alabama
Project Value: $35,000,000

V-6 Engine Building Expansion

Location: Georgetown, Kentucky
Owner: Toyota Motor Manufacturing Kentucky
Project Value: $30,000,000
 

TMMK Body Weld Additions

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $17,000,000

Rail Cross Dock Building

Location: Spring Hill, Tennessee
Owner: General Motors Corporation
Project Value: $9,500,000

IMN Building Expansion (Design Build)

Location: Canton, Mississippi
Owner: Nissan North America
Project Value: $2,000,000
 

Paint Shop Mezzanines

Location: Wentzville, Missouri
Owner: General Motors
Project Value: $32,000,000

Body Shop Tooling Install

Location: Spring Hill, Tennessee
Owner: General Motors
Project Value: $5,000,000
 

AAX3 Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $2,100,000

Pontiac Stamping Tryout Press Pit

Location: Pontiac, MI
Owner: General Motors Corporation
Project Value: $3,033,000

Pontiac Fuel Cell Lab Expansion

Location: Woodhaven, MI
Owner: Ford Motor Company
Project Value: $50,000,000
 

Woodhaven Stamping Plant

Location: Bedford, IN
Owner: General Motors
Project Value: $6,000,000
 

Die Cast Machine Steel

Location: Dearborn, Michigan
Owner: Ford Motor Company
Project Value: $8,000,000
 

Operating Floor Steel

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $14,000,000
 

Concrete Slab Project

Location: Livonia, Michigan
Owner: Ford Motor Company
Project Value: $4,000,000
 

Case Machining Line Installation

Location: Wayne, Michigan
Owner: Ford Motor Company
Project Value: $15,000,000
 

Lines 5 & 6 Press Pits

Location: Flint, Michigan
Owner: General Motors
Project Value: $49,000,000
 

General Assembly Strategic Supplier

Location:  Lansing, Michigan
Owner: General Motors
Project Value: $30,000,000
 

C1Yx Building Expansions

Location: Warren, Michigan
Owner: General Motors
Project Value: $14,000,000
 

Aerodynamics Lab & Reduced Scale Wind Tunnel

Location: Warren, Michigan
Owner: General Motors
Project Value: $3,000,000
 

GFE Equipment Installation

Location: Plymouth, Michigan
Owner: Hyundai Mobis 
Project Value: $7,000,000
 

Mobis North America Technical Center

Location: Three Rivers, Michigan
Owner: American Axle & Manufacturing
Project Value: $4,000,000

RDU & PTU Tool Install

Location: Kokomo, Indiana
Owner: FCA US LLC
Project Value: $2,000,000
 

Prismatic Generation 2 Equipment Installation

Location: Wayne, Michigan; Woodhaven, Michigan; Chicago, Illinois
Owner: Ford Motor Company
Project Value: $25,000,000 Annually
 

Construction Commodity Management
Aristeo has worked with Marathon since 2005 and has never had a recordable safety incident on any of our projects. Their dedication to safety and doing work right has made Aristeo a preferred contractor. We are impressed by the service Aristeo provides and will continue to recommend their team on upcoming projects. Marathon Petroleum Company LLC