Higher Education

Oakland University

High Temp Hot Water Tunnels

Oakland University - Higher Education - Aristeo Construction  - Screen_Shot_2016-05-24_at_1

The scope of work included all labor and materials for the installation of approximately 1,000 LF of utility tunnels ranging from 12 FT to 17 FT deep and coordination of all mechanical, electrical, and building maintenance systems (BMS) inside the new tunnels and existing buildings.

Aristeo’s Steel Division provided and installed miscellaneous steel supports, access hatches, and unique tunnel platforms with ladders.

Throughout the six month duration, Aristeo avoided interference with campus activities, transportation and pedestrian pathways, buildings, and facilities.

Aristeo has worked with Marathon since 2005 and has never had a recordable safety incident on any of our projects. Their dedication to safety and doing work right has made Aristeo a preferred contractor. We are impressed by the service Aristeo provides and will continue to recommend their team on upcoming projects. Marathon Petroleum Company LLC