Eberspacher Technical Research and Development Center


This text is replaced by the Flash movie.

Eberspächer’s new technical center was designed and built as three separate building structures to isolate vibration between the immediately adjacent buildings. Aristeo served as the prime concrete contractor working directly with construction manager, Walbridge Aldinger. This foundation package for all three buildings and their connectors totalled 3,000 yards of concrete and over 180 ton of reinforcing steel. 

The one-story office and shop are joined by conventional slab-on-grade building connectors. The office is comprised of 90% recessed floor to facilitate the installation of an elevated computer floor. The laboratory is housed in a two-story structure with a multilevel basement which includes a matrix of structural beams and columns to support excessive canti- levered loadings. The floors are comprised of slab-on-grade and cast-in-place structural slab. The elevated slabs were an atypical design keeping concrete in the web of the beam or flush with the bottom flange while creating a concrete curb to support the second floor masonry and structural steel.

Project Name

New Technical Research & Development Center
Novi, Michigan

 

Owner

Eberspächer North America, Inc.

 

Construction Manager

Walbridge Aldinger
613 Abbott Street
Detroit, MI 48226

 

Project Value

$1,500,000

 

Delivery Method

Self-Performed Services

 

Size

56,000 FT2 - 3 Buildings & Connectors Combined

 

Year Completed

2002

 

Architect/Engineer

Ghafari Associates, L.L.C.

 