Chrysler 3.5L Engine Program


This text is replaced by the Flash movie.

Aristeo Construction completed the extensive site preparation, flumes and foundations packages at Chrysler's Kenosha Engine Plant. Site preparation for this new plant included excavation, sheeting, storm sewers, fire protection water lines, storm water interceptor pits and on-site paving. We placed more than 12,000 cubic yards of concrete in the filter gallery, head line, crank line and engine assembly areas. Project highlights include:

  • 350,000 FT2 of trap rock floors and wet decks
  • 3,000 lineal feet of flume
  • 2,000 feet of trenches & 2 sizeable filter pits
 

Project Name

2003 MY 3.5L Engine Program
Kenosha Engine Plant
Kenosha, Wisconsin

 

Owner

Chrysler LLC
800 Chrysler Drive
Auburn Hills, MI 48326 

 

Construction Manager

Graycor Industrial Constructors
2711 60th Avenue
Kenosha, WI 53140

 

Project Value

$15,000,000

 

Delivery Method

Concrete Contractor
 

Project Size

500,000 FT2

 

Year Completed

2001 

 

Architect/Engineer

Albert Kahn Associates
 

 

 