Body Side Building Addition Chicago Assembly Plant
This text is replaced by the Flash movie.
Aristeo Construction Company was awarded the design/build package for the Body Side Building Addition at Chicago Assembly Plant. The body shop addition ties into an existing structure over 1,000 lineal feet to accommodate construction of new 100’ x 66’ bays, which provide more open floor space in the plant. Serving as design/build general contractor, Aristeo performed all the planning, scheduling, subcontract bidding and award, and field supervision. All construction activities required careful coordination with plant personnel to maintain the schedule without interrupting ongoing plant operations.
Project Highlights
-
Enlarge existing caissons, columns, and footings to carry load of expansion (100’ clear span truss)
-
Reinforce existing superstructure to raise roof segments totalling 10,000 FT2
-
Construct new substation
-
Relocate cooling tower
-
Site utilities
-
Remove and replace site paving
-
Six (6) loading docks
Project Name
Body Side Building Addition Chicago Assembly Plant
Chicago, Illinois
Owner
Ford Motor Company Vehicle Operations
17000 Oakwood Boulevard
Dearborn, MI 48121
Project Value
$13,125,000
Delivery Method
Design/Build General Contractor
Size
97,000 FT2
Year Completed
2003
Architect/Engineer
Gala & Associates